Cut edge corrosion roof repair for facilities managers
Roof surveys, cut edge corrosion treatment, full roof coatings and gutter lining, carried out by expert contractors at a fixed price and guaranteed through Basecare.
- Guaranteed through Basecare
- BBA and ETA certified systems
- No closing the building

Our roof services
Whatever state the roof is in, the survey decides what it needs, and the work is carried out by expert contractors to a written specification with one guarantee at the end.
Roof surveys and condition reports
The whole roof surveyed from the roof or by drone, with a written report and a fixed quote.
Cut edge corrosion treatment
Corrosion treated at the laps, eaves and rooflights, then sealed and coated with a certified system.
Full roof coating
A spray-applied coating across the whole roof, renewing the surface and covering every lap and fixing.
Gutter lining
Box and valley gutters relined along their full length, with the joints and outlets sealed.
Moisture mapping
Wet insulation found and mapped before the repair, so nothing is sealed in under the coating.
Maintenance plans
A planned inspection cycle that keeps the roof, and the guarantee, in good order.
Roof repairs that keep your building running
The work is done from the roof and planned around your site, so staff, deliveries and customers carry on as normal.
All from the roof
Nothing comes through the ceiling and nothing inside has to move.
Around your working day
Access and hours are agreed first, and the contractor works around deliveries, shifts and busy periods.
No strip-out
No old sheets coming off and no skips on site, so the building looks and runs as your staff and customers expect.
Fixed-price quotes you can budget for
You get a full condition report and a fixed quote before anything starts, so the figure you take to your budget holder is the figure you pay. Larger roofs can be phased across financial years.
A full condition report
The whole roof surveyed and written up, so you know what needs doing now and what can wait.
Fixed before work starts
The quote comes with the report and does not move once it is agreed.
Phased if you need it
The worst areas first and the rest planned into a later budget, each phase guaranteed as it is finished.
Materials and workmanship guaranteed together
One guarantee covers the whole repair, so there is no gap between the product and the people who put it on.
- Materials and workmanship covered together, through Basecare
- Every system certified, and installed by an expert contractor to a written specification
- Inspected on completion before the guarantee is issued
- Kept in place with a maintenance plan
The term depends on the system specified and is confirmed in writing before work starts.

Certified roof repair systems
Four liquid-applied systems, from treating corrosion at the laps and eaves to coating the whole roof. The survey decides which your roof needs.
| Cut edge corrosion | Laps and verges | Fixings | Whole roof | Gutters | |
|---|---|---|---|---|---|
| STPSilane terminated polymer | Yes | Yes | Yes | No | Yes |
| PolyurethaneReinforced repair system | Yes | Yes | No | No | Yes |
| Hybrid polymerSpray roof coating | No | Yes | Yes | Yes | No |
| PolyureaFast-cure spray coating | No | Yes | Yes | Yes | No |
All systems BBA and ETA certified, CE marked and tested to C5.
Manage your roof online
Reports, quotes, progress and guarantees for every roof you look after, in one account.
- Follow the jobSee where things are, from assessment to guarantee.
- Documents in one placeThe condition report, the quotation and the completion records, ready to download.
- Message the teamQuestions and updates on the job, in one thread rather than an inbox.
Frequently asked questions
Straight answers on access, cost, disruption and paperwork.
Will we need to close the building?
No. The work is done from the roof, nothing comes through the ceiling, and the contractor works around your deliveries and shifts. Access and working hours are agreed before anyone goes up.
Is repairing cheaper than replacing the roof?
Almost always. There is no strip-out, no disposal of old sheets and far less time on site. The survey comes with a fixed quote, so you can compare it with a replacement price like for like.
Do you need access inside the building?
Usually not. Occasionally the surveyor will want to see the underside of a gutter or a rooflight from inside, and that is arranged with you first.
What paperwork do we get?
The condition report, the specification, the completion records and the guarantee certificate, all kept in your online account as well as sent to you.
Can the work be spread across budgets?
Yes. The report sets out the roof area by area, so the worst can be done first and the rest planned into a later budget, with each phase guaranteed as it is finished.
What happens after the repair?
A maintenance plan keeps the roof on an inspection cycle so the guarantee stays in place, and anything new is picked up before it becomes a repair.
Ready to get it sorted?
Start with a free assessment. If the roof needs a survey, a specialist books it. If it needs repairing, the work is guaranteed.
Free assessment
A few details about the roof. Takes a few minutes, commits you to nothing.
Start the assessment